Close

Extension to Waikawa Marina

untitled-design-10

Feedback period closes on 15th December 2017.

Port Marlborough is progressing an extension of the existing Waikawa Marina to provide additional berthage for the boating community.

The extension is planned for the newer area of Marina Zone adjacent to The Snout, immediately to the north of the existing breakwater.

The proposal is for the construction of a high quality marina facility that will provide around 240 new berths.

Port Marlborough is interested in hearing the community’s views on the proposal before the design is finalised – you can download the proposal below, including a printable copy of the feedback form to post to us.

Download Community Consultation Brochure (PDF)

Download printable version of the Feedback form (PDF)

Or you can fill in an online version of the Feedback form below:

Oops! We could not locate your form.

Latest News